ENEL TIOZZO DISTRIBUTION 2002 |
![]() |
|
CONTROLLED HORIZONTAL DRILLING: This method was born to enable execution of piping laying under river beds and is currently used for piping laying in different areas. Variation of methane pipeline DN 300 (12") in Fusina. |
|
![]() |
|