INTERVENTION AIMED TO THE PHYSICAL SAFEGUARD OF VENICE



IMPRESA COSTRUZIONI MANTOVANI S.p.a.

Intervention named: Bocca di Lido Treporti -TURA E PORTO RIFUGIO I^ PHASE.
Realization of structural works made of double metallic gangplanks AZ26 and profiles HZ975D12/14 length ml 28,50 with system HZ PROFILARBED.

treporti venezia progetto mose



Intervention named: Bocca di Lido Treporti - COMBINED WALL WEST SHOULDER II^ PHASE
Realization of combined wall and civil work of piping driving in steel diam. mm 1420 and mm 1016 of length ml 32,00 and double metallic tackles PROFILARBED AZ14/26/36 and provisional tackles HZ775/AZ18


GRANDI LAVORI FINCOSIT S.p.a.

Intervention at lagoon straits for flows regualtion, Bocca di Lido – San Nicolò South Shoulder and land activity set up and prefabircated tanks. 
Subaqueous set up of metallic gangplanks, regular edge and double "T", aimed to the realization of subaqueous bulkheads of Shoulder tank and of digging limitation.

pontone Dinosauro
Pontoon Dinosauro 
Stocking Pontoon SEC -ONE