ACTIVITY AIMED TO THE PHYSICAL SAFEGUARD OF VENICE



IMPRESA DI COSTRUZIONI ING. MANTOVANI S.p.a.

MOSE PROJECT 

Intervention: Bocca di Malamocco – Combiend wall of navigation basin

Doors Housing:

Realization of combined wall in steel pipes diam. 1420 (lenght ml 37,00) and of double metallic gangplanks  type LARSSEN 606 + 0,5 e 604 (lenght up to ml 37,00) HOESCH system.





 tucano pontone


















Pontoon TUCANO
equipped with track crane LIMA CLARK

Intervention: Bocca di Malamocco – Combined wall of Navigation Basin - Realization of  combined wall in steel diam. 1420, lenght up to ml 37,00 and of double metallic gangplanks type LARSSEN 606k and 604 lenght ml 32,00 HOESCH system.