ACTIVITY AIMED TO THE PHYSICAL SAFEGUARD OF VENICE: MOSE PROJECT 2005 - 2007



BOCCA DI MALAMOCCO

Intervention: Bocca di Malamocco – Combined wall of Navigation Basin - Realization of  combined wall in steel diam. 1420, lenght up to ml 37,00 and of double metallic gangplanks type LARSSEN 606k and 604 lenght ml 32,00 HOESCH system.

Follows...


BOCCA DI LIDO TREPORTI

TURA E PORTO RIFUGIO I^ PHASE
Realization of structural works made of double metallic tackles AZ26 and profiles HZ975D12/14 length ml 28,50 with system HZ PROFILARBED.

COMBINED WALL WEST SHOULDER II^ PHASE
Realization of combined wall and civil work of piping driving in steel diam. mm 1420 and mm 1016 of length ml 32,00 and double metallic tackles PROFILARBED AZ14/26/36 and provisional tackles HZ775/AZ18.

Follows...


BOCCA DI LIDO  SAN NICOLO'

Intervention at lagoon straits for flows regualtion, Bocca di Lido – San Nicolò South Shoulder and land activity set up and prefabircated tanks.
Subaqueous set up of metallic gangplanks, regular edge and double "T", aimed to the realization of subaqueous bulkheads of Shoulder tank and of digging limitation.